Tsumeb smelter’s Ausmelt furnace maintenance extends to 40 days
TORONTO – Dundee Precious Metals has updated information on the planned Ausmelt furnace maintenance at the Company’s Tsumeb smelter in
Read moreTORONTO – Dundee Precious Metals has updated information on the planned Ausmelt furnace maintenance at the Company’s Tsumeb smelter in
Read moreAnglo American Platinum has safely and successfully completed the rebuild of the Anglo Converter Plant (ACP) Phase A unit, with
Read moreAt Hoa Phat Group, Vietnam, a consortium consisting of WISDRI Engineering & Research Incorporation Ltd. and SMS has completed the
Read moreAnglo American Platinum has made the pre-emptive decision to close the Anglo Converter Plant (ACP) Phase B unit, following a
Read moreGlobal refined platinum production in Q2’20 fell by 43% (-712 koz) to 954 koz, with South Africa representing the bulk
Read moreAnglo American Platinum announced on 3 June 2020 that a water leak had been detected in the high-pressure cooling section
Read moreIn stainless steel production – as in almost any kind of industrial activity – it is important to know what
Read more