Ivanplats receives final $225 million prepayment for Platreef
JOHANNESBURG, SOUTH AFRICA – Ivanhoe Mines Executive announces today that the company’s South African subsidiary, Ivanplats, has received the second
Read moreJOHANNESBURG, SOUTH AFRICA – Ivanhoe Mines Executive announces today that the company’s South African subsidiary, Ivanplats, has received the second
Read morePlatreef’s Phase 2, 5.2-million-tonnes-per-annum steady state production rate would rank it as the world’s fifth largest primary platinum-group metals mine
Read moreThree development stations on Shaft 1 have been completed on the 750-, 850-, and 950-metre levels. Underground development now is
Read moreCAPE TOWN, SOUTH AFRICA – Ivanhoe Mines has announced at the African Mining Indaba Conference, the completion of the Shaft
Read moreIvanhoe Mines has announced outstanding positive findings of an independent Platreef 2022 Feasibility Study for the Platreef palladium, rhodium, nickel,
Read moreMining at the Ivanplats’ Platreef Project will be performed using highly-productive mechanized methods, including long-hole stoping and drift-and-fill. Each method
Read moreMining zones in the current Ivanplats’ Platreef mine plan occur at depths ranging from approximately 700 metres to 1,200 metres
Read moreThe construction of the 996-metre-level station at the bottom of Shaft 1 was completed in July 2020. The completed Shaft
Read moreThe Platreef Project is owned by Ivanplats, which is 64%-owned by Ivanhoe Mines. A 26% interest is held by Ivanplats’
Read moreMOKOPANE, South Africa – Ivanhoe Mines’ South African subsidiary, Ivanplats, has signed a non-binding term sheet with Orion Mine Finance,
Read more